FLOYD BioEnergy F60 CHP Configurator
| 2 Electricity Configuration Self-sufficiency target · Load profile · Electricity price · Operating hours | ||
| ⚡ Upload Electricity Bill |
PDF or image — upload one or more monthly bills, AI averages the results
|
|
| Behind the Meter Electricity Price | USD cents/kWh (self-consumption value) | |
| Self Sufficiency Target | % (default: 80%) | |
| Electric Peak Load | average kW | |
| Electric Off-Peak Load | average kW | |
| Electric Base/Average Load | average kW | |
| Company Operation | days per week | |
| Island Mode | Grid-independent operation — for FLOYD internal use | |
| Annual Operating Hours | hours/year | |
|
⚠ Load values changed - click to update CHP+BESS recommendation
|
||
📊 Select Your Business Load Profile(Optional - Click to expand)Choose the profile that best represents your facility's daily electricity consumption pattern. Click on an image to select. Three-Shift / Livestock
Two-Shift (17h)
Single-Shift (9h)
Solar Facility
EV-Charging
Tourism / Hotel
📋 Selected Profile & Recommendation:
|
||
| 3 Heat Configuration Behind-the-meter heat price · Fuel type · Gas pricing data | ||
| 🔥 Upload Gas / Heat Bill |
PDF or image — upload one or more monthly bills, AI averages the results
|
|
| Behind the Meter Heat Price | USD cents/kWh (self-consumption value) Auto-filled from gas data if available |
|
| Fuel Type | Select fuel type for heating cost calculation | |
| US State Gas Pricing | Residential average price (2024 data) | |
| Canadian Province Gas Pricing | 2026 delivered CAD/GJ · converted to selected currency/MCF · heating oil equiv. where no nat. gas | |
| Gas Price Data Year | Source: U.S. EIA – $/MCF residential | |
| Gas Usage Unit | Select measurement unit for gas usage | |
| Annual Gas Usage | therms/year (historical total) | |
| 4 Fiber Configuration Fiber cost · Fiber type & mix · Quality verification | ||
| Fiber Cost | {SYM}/metric ton or {SYM}/m³ Note: Fiber must have <15% moisture content and must be screened. |
|
| Primary Fiber Type | Bulk density & calorific value auto-filled · 10% MC (pellets <10%) | |
| Primary Fiber Percentage | Percentage of primary fiber in the mix (remainder will be secondary fiber) | |
| Secondary Fiber Type (Optional) | Auto-calculated: 0% of mix | |
|
⚠ Required for PDF download and quote submission
|
||
| 5 Additional Configuration Biochar · CO₂ · Labor · Commercial configuration parameters · CHP & BESS unit count | ||
| Biochar Price | $/ton | |
| CO₂ Certificate Price | $/ton CO₂ — each CHP unit generates 85 t/year | |
| O&M Labor Costs | {SYM}/hour (× 120 h/year) | |
| Number of CHP Units | units | |
| Number of BESS Units (261kWh each) | 0-10 units (cascadable) | |
| Conservative Business Approach | Per level: fiber cost +1%, elec/heat prices –1%, output –0.5% | |
| CHP Unit Price (from CHP.txt file) |
No file loaded - using default
|
Upload CHP.txt with unit price (e.g., "450000" for $450k). Falls back to default if missing. |
| Additional Infrastructure Costs (besides CHP and feeding system) | USD | |
| Monthly Rental / Lease Fee (Building / Infrastructure) | {CODE}/month — annualised automatically (×12) | |
| Financing Interest Rate | %/year | |
| Biomass Inflation Rate | %/year (applied to fiber cost) | |
| Electricity Inflation Rate | %/year (applied to electricity value) | |
| Heat Inflation Rate | %/year (applied to heat value) | |
| Biochar Inflation Rate | %/year (applied to biochar price) | |
| O&M Cost per CHP Unit (Annual) | USD per unit per year (spare parts, maintenance) | |
| O&M Inflation Rate | %/year (applied to O&M costs) | |
| Labor Inflation Rate | %/year (applied to labor costs) | |
| CO₂ Price Inflation Rate | %/year (applied to CO₂ certificate price) | |
| Down Payment | % of total investment costs (paid upfront, reduces financed amount) | |
| Non-Refundable Subsidies | % of total investment costs | |
| CHP Lifetime | years | |
| Company Name | Optional | |
| Contact Person | Optional | |
| Street Address | Optional | |
| Postal Code | Optional | |
| City | Optional | |
| Country | Required for subsidy search | |
| State / Province | Required for subsidy search | |
| Email Address | Optional | |
| Phone Number | Optional | |
| Industry / Facility Type | Helps tailor subsidy suggestions and benchmarks | |
| Describe your industry | ||
| Additional Requirements | ||
Look up your local renewable energy subsidies
Submit Quote Request
| Annual Fiber Consumption (volume) | — m³ | Total fiber volume needed |
| Annual Fiber Consumption (mass) | — t | Total fiber mass needed |
| Annual Electricity Production | — kWh | 70 kW peak / 45 kW off-peak per unit |
| Annual Heat Production | — kWh | 125 kW per unit |
| Total Annual Energy Production | — kWh | Combined output |
| Annual Biochar Production | — t | By-product for soil amendment |
| Biomass Cost | — | Fiber procurement |
| O&M Cost (incl. labor & spare parts) | — | Operations & maintenance |
| Annual Rental / Lease Cost | — | Building / infrastructure lease |
| Annual Depreciation | — | Straight-line over lifetime |
| Annual Interest Cost | — | Interest on outstanding loan balance |
| Capital Cost (incl. financing) | — | Annual loan payment |
| Total Annual Cost | — | Sum of all costs |
| Total Project CAPEX | — | Gross investment before subsidies |
| Electricity Revenue (Behind-the-Meter) | — | Behind-the-meter value |
| Heat Revenue (Behind-the-Meter) | — | Thermal energy value |
| Biochar Revenue | — | By-product sales |
| CO₂ Certificate Revenue | — | Carbon offset value |
| Total Annual Revenue | — | Sum of all revenues |
| Annual EBIT (Revenue − OpEx − Depreciation) | — | Before interest & tax |
| Net Annual Profit (after interest) | — | EBIT minus annual interest |
| Return on Investment (ROI) | — % | Annual return on total investment |
| ROI (Capital) | — % | Return on down payment only |
| IRR (Internal Rate of Return) | — % | Time-adjusted annual return rate |
| NPV (at cost of capital) | — | Net present value at interest rate |
| Breakeven Point | — | When accumulated EBIT covers net investment |
| Payback Time | — years | Time to recover investment |
Volume consumption based on selected fiber bulk density (10% MC unless otherwise noted).
Calorific value used from selected fiber type (kWh/kg).
CHP pricing: 1.5% discount per additional unit (max 15%). O&M: 2% discount per additional unit (max 20%).
Basic operation labor = labor rate × 120 hours/year.
Risk adjustments (per level): fiber cost +1%, elec/heat prices –1%, output –0.5%.
Revenues reflect behind-the-meter value only + biochar sales.
ROI based on net CAPEX after subsidies.
Payback Time = Down Payment / Net Annual Profit. Only the equity (down payment) portion needs to be recovered from profit — the financed portion is already repaid via annual loan payments. For 100% financed projects, payback equals the loan term.
O&M costs represent average annual costs over a 5-year period and may vary significantly depending on the operating quality and maintenance practices of the operator.
O&M costs represent average annual costs over a 5-year period and may vary significantly depending on the operating quality and maintenance practices of the operator.
Confirm Data Transmission
By clicking "Confirm & Send", you explicitly consent to the transmission of your personal data (name, company, contact details) and project calculation results to FLOYD BioEnergy via email. Your data will be used solely for processing your quote request and will be handled in accordance with applicable data protection regulations (GDPR/CCPA). You have the right to withdraw this consent at any time by contacting [email protected].
Recipient: [email protected]
Thank You!
FLOYD BioEnergy will be in touch with you shortly. We appreciate your interest and wish you a nice day.
Electrical Load Information
Use your energy meter or energy bill data to determine these values:
- Electric Peak Load: Maximum power consumption during high-demand periods (e.g., daytime operations, peak production hours). Typically found on your demand charges or as "maximum demand" on utility bills.
- Electric Off-Peak Load: Average power consumption during reduced-demand periods (e.g., evenings, weekends). Look for off-peak usage patterns in your hourly or time-of-use billing data.
- Electric Base Load: Continuous minimum power consumption that runs 24/7 (e.g., refrigeration, lighting, essential systems). This is the lowest sustained demand visible in your consumption profile.
Where to find this data:
- Energy bills (demand charges, kW peaks)
- Smart meter data or building management systems
- Utility company online portal (hourly usage graphs)
- Sub-metering equipment or energy monitoring systems
Tip: If you don't have detailed load data, start with zeros. These values help optimize CHP and BESS sizing but are optional for basic calculations.
An Anthropic API key is required to use the AI assistant.